Results
Company: | Shell UK – Leman Alpha platform |
Situation: | Execution of maintenance works in TA |
Result: | Reduction of platform downtime and limit blowdown volume |
The Leman Alpha complex is a Shell UK owned and operated production platform, located in the Southern North Sea sector of the UK.
The DBB-SAVER was used to safely isolate the platform from the pressurized 30” sea pipeline to safely execute works in a Turn Around. It was used to vacumize the section between the Sub Sea Isolation Valve and the Riser Valve. The High Capacity DBB-SAVER model was selected for this deployment to compensate for some performance loss due to the long hose lenghts used to hook the DBB-SAVER up to the bleed point.
The DBB-SAVER outlet was hooked up via hoses with the platform vent system via a tie-in also.
The Turn Around could start as planned without any delays or safety issues caused by the passing isolation valves. The DBB-SAVER stayed in continuous operation for >70 days during the whole TA.
Link to the customers website:
www.shell.co.uk/business-customers/upstream-oil-and-gas-infrastructure/north-sea-operated-assets.html
Company: | Shell UK – Leman Alpha platform |
Situation: | Execution of maintenance works in TA |
Result: | Reduction of platform downtime and limit blowdown volume |
Please fill out the boxes and we’ll contact you on short notice.
The safety of your personal data is important to us. These will never be shared with any third party.