Company: NAM UGS Norg
Situation: Planned maintenance (hot work on a pressure vessel)
Result: Saving blowdown volume, outage time and outage of remaining plant
The DBB-SAVER was used to perform work on equipment on the Underground Gas Storage Norg in The Netherlands, owned by NAM and operated by Shell. hot work (welding) had to be performed on a pressure vessel.
The DBB-SAVER was used to secure both inlet and outlet valves and their equalization bypasses, so four bleed points in total. These were all connected to a 100 meter long temporary vacuum header system, delivered and installed by Valvetight. Two DBB-SAVERs were connected to this central header, one as primary unit and the second as a back-up in case of increased leakage, which would be automatically activated if necessary.
The DBB-SAVERs stayed in operation for 12 days, providing a save work area.
Links to the customers websites:
www.nam.nl
www.shell.com
Company: NAM UGS Norg
Situation: Planned maintenance (hot work on a pressure vessel)
Result: Saving blowdown volume, outage time and outage of remaining plant
Please fill out the boxes and we’ll contact you on short notice.
The safety of your personal data is important to us.
These will never be shared with any third party.