DBB-SAVER on L10-AR Pig Launcher
Home / ENI Energy L10-A

Pig trap door seal replacement

The ENI Energy L10-AR complex is the central hub for the main subsea gas transport pipeline NGT, with many other platforms tied in to this NGT trunk line as well. The pig trap launcher door needed to be opened while the NGT line remained in operation.

The DBB-SAVER provided the isolation on the single riser and single kicker valve body cavity of the Cameron T31 ball valves, making 100% sure there was no possibility of any gas passing from the NGT line towards the safe work area and create hermetically sealed valves. The vent outlet of the DBB-SAVER was straight up to safe area.

Straight after this project also another pig trap (the receiver from the D15 platform) was isolated to exchange some spools.

We thank ENI for their usual great cooperation, both in the preparation phase as well as during execution.

Link to the customers website:
ENI Energy

Results

 Company:   ENI Energy
 Situation:   36″ single valve isolation
 Result:   Guaranteed safe work environment with double block & vacuum

 

More…

Business cases

See other cases

Shell UK Leman Alpha

Platform isolation for Turn Around

Sakhalin Energy

Safe access to pig launchers

NAM K15-FA-1

Repair works on export gas pipeline
Contact

Interested in the DBB-SAVER?

Please fill out the boxes and we’ll contact you on short notice.

The safety of your personal data is important to us.
These will never be shared with any third party.

  • Dit veld is bedoeld voor validatiedoeleinden en moet niet worden gewijzigd.